What Is the Next Tallest Building in the World
The next world's tallest building is Jeddah Tower, a skyscraper project in Jeddah, Saudi Arabia. It is designed to surpass the Burj Khalifa and become the first structure to exceed 1,000 meters in height. The project is led by Saudi Arabian developer Jeddah Economic Company and designed by Adrian Smith + Gordon Gill Architecture. As of the latest public updates, the tower remains under active planning and preconstruction, with no confirmed completion date. The building is intended to include offices, residential units, and hotel space across its supertall core.
The current tallest building in the world is the Burj Khalifa in Dubai, United Arab Emirates, standing at 828 meters. Jeddah Tower is expected to exceed this height by a wide margin, targeting a symbolic height above 1,000 meters. The structure will use a buttressed core structural system and high-performance concrete to manage wind loads and seismic forces at extreme height. Its design focuses on a sleek, tapering form to reduce vortex shedding and structural sway. The tower will be located in the Jeddah Economic City development along the Red Sea coast.
Who Is Developing the Next Tallest Building
The primary developer behind Jeddah Tower is Jeddah Economic Company, a Saudi joint-stock company established to lead large-scale projects in the Jeddah region. The project has received key approvals from Saudi authorities and is integrated into the Kingdom's Vision 2030 economic diversification agenda. Funding and investment details are managed through a mix of public and private capital, with the Saudi government supporting the broader Jeddah Central project. The design and engineering work is handled by Adrian Smith + Gordon Gill Architecture, the firm also responsible for the Burj Khalifa's structural concept. Construction contracts and supply chain decisions are expected to be announced as the project moves closer to the building phase.
Major contractors and consultants involved in the project include firms with experience in supertall and megatall building construction. The structural engineering, geotechnical investigation, and wind-tunnel testing have been conducted by specialized global engineering consultancies. Material suppliers for high-strength concrete, steel, and advanced cladding systems are being sourced to meet the extreme height requirements. The project also involves international elevator and vertical-transit consultants to design systems capable of serving floors above 150 levels. Detailed project timelines and contractor awards are published through official Saudi investment and construction regulatory channels.
When Will the Next Tallest Building Be Completed
Jeddah Tower does not currently have a publicly confirmed completion date, and the project timeline has shifted multiple times since initial announcements. The original schedule targeted a completion window in the late 2020s, but preconstruction activities have proceeded in stages, with site preparation and foundation studies advancing first. As of the latest available public data, the project remains in the planning and early procurement phase, with no fixed groundbreaking date announced. The timeline depends on finalization of financing, regulatory approvals, and contractor selection for the main construction package.
Delays in megaprojects of this scale are common due to engineering complexity, supply chain factors, and evolving regulatory requirements in the host country. The project's progress is tracked through Saudi government investment portals and official statements from Jeddah Economic Company. Once construction begins, the tower is expected to take several years to complete, given the unprecedented height and technical challenges involved. Real-time updates on the project status are available through official Saudi economic development announcements and the developer's public communications.